Sunday, May 9, 2010

Mega Update

After pulling the engine, I looked at the codes. Turns out the block is a 1974 350, not a 1973 400. After a search, found a 1974 455 longblock and brought it home. Taken apart, we see that the block is pretty good, so it is being sent off for cleaning, then boring .030 over.

Because the Edelbrock 72cc heads will create over 11.5 compression, we are going for dished pistons as well.

While this turned into another roadbump, this will turn out to be something much better in the end.

Wednesday, March 10, 2010

Ordered a few things for the Mistress:

From Butler Performance
  • Custom Edelbrock 72cc aluminum heads
  • Custom Edelbrock Performer RPM intake
  • Comp Cams XE274 cam & lifters
  • Push Rods
  • PRW 1.5 full roller rockers
  • bolts & gaskets
  • Butler Street Performance harmonic balancer

From Ram Air Restorations
  • Oversized Ram Air Exhaust Manifolds
  • Silver ceramic coating
  • 2.5" Downpipes

From Summit Racing
  • Hughes GM25-BPO 10" 2500-stall torque converter
  • Oil pan plug
  • gaskets

As soon as this all comes in, the GTO's motor is being pulled, cleaned, painted and all this will be installed.

Monday, August 3, 2009

Shifter Install

Installed the B&M Pro-Stick automatic shifter.
This works very well, and I like it much more than the ratcheting shifters. I also moved it back towards the seats, instead of being all the way up under the dash. Now the carpet needs to be redone to hide the giant hole. I have to call B&M because the neutral safety switch doesn't work appropriately.








The carpet is now cut so it "flaps" over the seats, so it looks much cleaner.

Locked the column shifter in place so that it does not swivel anymore.

Sunday, July 26, 2009

Installed a battery cutoff switch in the engine compartment. Much easier to turn the electric off instead of pulling the battery cable.

Ordered header gaskets to see if I can stop the ticking sound, which might be exhaust leak.

Also ordered a B&M Pro Stick shifter

Monday, July 20, 2009

Last week, went to the Edison Light Cruisers show and my suspension dropped out on the left driver side. We did win a trophy though!

Sunday, installed the new heavy-duty springs and KYB shocks just to get her back on the road. The car rides MUCH higher (about 2 inches) and there are NO rubbing issues. Very excited for the change.




Sunday, May 24, 2009

Sound!

This weekend, we put in 4 pioneer speakers.

Front - Pioneer 6.5s in molded kickpanels

Rear - Pioneer 3-way 6x9s on the rear decklid (needed to cut and grind 2 holes to fit them).

Also removed REVERB box

Tested, and everything works well!



Rear decklid


Pass kickpanel


Driver kickpanel


Updated Engine bay pics







Next project: Paint parts of engine bay, replace Edelbrock carb with Holley carb, fix horns.

Sometime soon: Replace suspension.

Sunday, May 17, 2009

Begin Car Season 2009

Started working on the car again
1. Replaced all locks, now I have 2 keys
2. Replaced door knobs
3. Installed new air cleaner
4. Added fuzzy dice!
5. Added Kenwood head unit, installed under the dash.

Will add more photos shortly.





Friday, October 10, 2008

Piston-head

Added Piston-head shift knob and door locks



Saturday, September 27, 2008

Ignition switch

Replaced the ignition switch, took out the "start button". Now the key switch works correctly.

Monday, September 1, 2008

Yesterday, installed chrome flexible upper radiator hose. Also, replaced the shifter with with another one, which should make for MUCH easier shifting.